Orion Prepares to Move to Launch Pad | NASA
PS-the test when well.
On Dec. 4, Orion is scheduled to launch atop a United Launch Alliance Delta IV Heavy rocket from Cape Canaveral Air Force Stations Space Launch Complex 37 in Florida. During the test, Orion will travel 3,600 miles in altitude above Earth. 4 1/2 hours later, the spacecraft will reenter the atmosphere at 20,000 mph and splash down in the Pacific Ocean. Orions first flight will verify launch and high-speed reentry systems such as avionics, attitude control, parachutes and the heat shield.
Four recently-installed protective panels make up Orion's Ogive. The Ogive reduces drag and acoustic load on the crew module, making it a smoother ride for the spacecraft. Pictured here, inside the Launch Abort System Facility at NASAs Kennedy Space Center in Florida, a crane brings the fourth and final Ogive panel closer for installation on Orion's Launch
Abort System.
The Ogive installation was one of the last pieces of the puzzle for Orion prior to its move to the launch pad on Nov. 10. There, it will be lifted and attached to the rocket for its December launch.
SpaceX Targets May 6 for Pad Abort Test of New Crew Spacecraft
SpaceX Targets May 6 for Pad Abort Test of New Crew Spacecraft | NASA
PS-the test when well.
On Dec. 4, Orion is scheduled to launch atop a United Launch Alliance Delta IV Heavy rocket from Cape Canaveral Air Force Stations Space Launch Complex 37 in Florida. During the test, Orion will travel 3,600 miles in altitude above Earth. 4 1/2 hours later, the spacecraft will reenter the atmosphere at 20,000 mph and splash down in the Pacific Ocean. Orions first flight will verify launch and high-speed reentry systems such as avionics, attitude control, parachutes and the heat shield.
Four recently-installed protective panels make up Orion's Ogive. The Ogive reduces drag and acoustic load on the crew module, making it a smoother ride for the spacecraft. Pictured here, inside the Launch Abort System Facility at NASAs Kennedy Space Center in Florida, a crane brings the fourth and final Ogive panel closer for installation on Orion's Launch
Abort System.
The Ogive installation was one of the last pieces of the puzzle for Orion prior to its move to the launch pad on Nov. 10. There, it will be lifted and attached to the rocket for its December launch.
SpaceX Targets May 6 for Pad Abort Test of New Crew Spacecraft
SpaceX Targets May 6 for Pad Abort Test of New Crew Spacecraft | NASA
Aucun commentaire:
Enregistrer un commentaire